How a safe move actually works
Most damage on safe moves comes from rushing or guessing. Our process is built to remove both.
- I
Site survey
A specialist visits to assess access routes, floor loadings, doors, stairs and the safe itself. We listen to what you need.
- II
Plan and quote
We send a clear written plan and a fixed quote. No surprises. We agree timings that suit your site, including out-of-hours where needed.
- III
On the day
Our engineers protect floors and frames, then lift, skate and steer the safe along the planned route. Calm, methodical and quiet.
- IV
Install and sign-off
The safe is set down, levelled, bolted where required and tested. We tidy up and hand it back to you ready to use.